index

Karjearl Black Industrial Semi Flush Mount Ceiling Light, Vintage Metal Cage, 11.8"

  • $65.44
  • Regular price $93.49
  • Will be in stock after
Promo IconWELCOME5: Use code WELCOME5 for 5% off on your first order

Hurrify, 0 item(s) left in stock!

Join Waitlist
Wishlist
Customer Love Badge
Loved by +2,002 customers   
Profile 1 Profile 2 Profile 3 Profile 4

Vendor: Karjearl, Manufactured By Bright New Way

Type: Ceiling Fans

Sku: WBLSDB0949JLY8B

Available: Sold Out

- No EU import duties.
- Ships within 1-2 business days.
- Ships in our fully recyclable and biodegradable signature boxes.
- International orders will incur shipping fees, which are calculated at checkout. International delivery typically takes 8-12 business days.

Guarantee safe checkout

Karjearl Black Industrial Semi Flush Mount Ceiling Light, Vintage Metal Cage, 11.8"

$65.44

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)

Frequently Asked Questions

  • Q: What type of bulbs can I use with the Karjearl Farmhouse Semi Flush Mount Ceiling Light? A: The Karjearl ceiling light features an E26 US standard lamp socket, making it compatible with various types of bulbs, including Edison, CFL, and LED light bulbs. The maximum wattage allowed is 100W.
  • Q: Is this ceiling light suitable for sloped ceilings? A: Yes, this semi flush mount ceiling light is designed specifically for sloped ceilings. It includes an adjustable angle light pole, allowing for easy installation and optimal lighting even on angled surfaces.
  • Q: Can I dim the lights with this fixture? A: Yes, when used with dimmable bulbs and dimmable switches, the Karjearl ceiling light can be dimmed to adjust the brightness according to your preference.
  • Q: What material is the ceiling light made of? A: The Karjearl Farmhouse Semi Flush Mount Ceiling Light is constructed from high-quality iron. This ensures durability and resistance to rust, while also providing a classic vintage industrial aesthetic.
  • Q: Where can I install this ceiling light? A: This versatile ceiling light is perfect for a variety of spaces, including kitchens, hallways, entryways, bedrooms, living rooms, dining rooms, garages, and even barns. Its classic design complements many interior styles.